To ensure the successful launch of this train service, CR-Xi'an strengthened coordination in transportation organization and freight dispatching, optimizing the train transportation plan. As the starting station of the train service, Xi'an International Port Railway Station optimized the operation process based on the principle of "priority for space allocation, priority for loading and unloading, priority for inspection, and priority for departure." This optimization enhanced operation efficiency, achieved rapid and seamless connection between transportation, inspection, and transfer, and provided strong transportation support for the smooth operation of the train service.